Problem

1956 AHSME Problem 47

An engineer said he could finish a highway section in 3 days with his present supply of a certain type of machine. However, with 3 more of these machines the job could be done in 2 days. If the machines all work at the same rate, how many days would it take to do the job with one machine?

\textbf{(A)}\ 6 \qquad \textbf{(B)}\ 12 \qquad \textbf{(C)}\ 15 \qquad \textbf{(D)}\ 18 \qquad \textbf{(E)}\ 36


Full credit goes to MAA for authoring these problems. These problems were taken on the AOPS website.


Show/Hide Problem Tags

Problem Tags: No tags

Want to contribute problems and receive full credit? Click here to add your problem!
Please report any issues to us in our Discord server
Go to previous contest problem (SHIFT + Left Arrow) Go to next contest problem (SHIFT + Right Arrow)